The office building at 300 Jefferson Boulevard in Warwick houses offices containing over 300 employees. The growing demand for EV vehicles required a solution for these employees to charge their vehicles while working. The solution implemented for this location was to install (4) Chargepoint CT-4021 dual-port bollard mount charging stations. This allows for up to (8) electric vehicles to charge simultaneously. The project included contributions from National Grid and the Rhode Island Office of Energy Resources totaling almost 90% of the total project cost.
Worcester Polytechnic Institute - Gateway Garage
100 Institution Road
Worcester, MA 01609
Worcester Polytechnic Institute was founded in 1865 in Worcester, WPI was one of the United States' first engineering and technology universities and now has 14 academic departments with over 50 undergraduate and graduate degree programs in science, engineering, technology, management, the social sciences, and the humanities and arts, leading to bachelor's, master's and PhD degrees. WPI has over 7000 students and faculty that were in need of a means to charge electric vehicles. The solution implemented for this location was to install (5) Chargepoint CT-4023 dual-port wall mount charging stations. This allows for up to (10) electric vehicles to charge simultaneously. The project included contributions from National Grid totaling over 70% of the total project cost.